The overall objective of VULKANO project is to design, implement and validate an advanced retrofitting integrated solution to increase the energy and environmental efficiency in existing preheating and melting industrial furnaces currently fed with natural gas. This will be achieved through implementing combined new solutions based on high-temperature phase change materials (PCMs), new refractories, optimized co-firing, advanced monitoring and control systems and a holistic in-house predictive tool.
Excel ID:
i00058